Factory supplied Aluminum Extrusion Factory - Ductile iron part for motor GGG40, GGG40.3 GGG50, GGG60, GGG70 – Neuland Metals
Factory supplied Aluminum Extrusion Factory - Ductile iron part for motor GGG40, GGG40.3 GGG50, GGG60, GGG70 – Neuland Metals Detail:
Product name: Ductile-iron-part-for-motor
Material: GGG40, GGG40.3 GGG50, GGG60, GGG70, ASTM 60-40-18, 65-45-12, 70-50-05, 80-55-06, 100-70-03, FCD400-15, FCD500-7, FCD600-3
Production process: Sand casting, annealing, precision machining, shell molding casting, resin sand casting, sand blasting
Production facility:
Automatic molding line, Disa vertical molding line, Japan Tokyo horizontal molding line, resin sand molding line, shell molding line
Maximum flask size: 2000mm x 2000mm x 1000mm
Available service: OEM, Design optimization, precision machining, heat treatment, cnc machining, milling, drilling. Painting, powder coating, electroless nickel plating. Zinc Plating, E-coating. HDG, hot galvanizing
Unit Weight: 0.1kg-1000kg, 0.2lbs-2000lbs
Size: According to drawing
Customizable or not: Yes
Packing: Carton, plywood cases, pallets
Certificate: ISO9001:2008
Inspection report: Dimension report. Material report including chemical contents, tensile strength, yield strength and hardness. X-ray test report, Ultrasonic test report and Magnetic particle test available upon request.
Origin: China
Product detail pictures:
Related Product Guide:
Our firm sticks to the basic principle of "Quality is the life of your company, and status will be the soul of it" for Factory supplied Aluminum Extrusion Factory - Ductile iron part for motor GGG40, GGG40.3 GGG50, GGG60, GGG70 – Neuland Metals , The product will supply to all over the world, such as: Paraguay, French, azerbaijan, At present our sales network is growing continually, improving service quality to meet customer's demand. If you are interested in any products , please contact us at anytime. We are looking forward to forming successful business relationships with you in near future.
This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.










